The digging-holes-and-filling-them-again in Sproxton Lane is coming to an end, with "Riverbend" last in line in this cul-de-sac. They dug a trench to the "blind" corner by the bottom gate, and then bored below the road to surface at the top gate.
The sewerage and the town water connections are now inside our gate.
We've been told that we'll get their town water and they'll get our s**t before Christmas! I wonder who's getting the more desirable present?