Wednesday, November 13, 2024

Digging holes and filling them again

 

 

The digging-holes-and-filling-them-again in Sproxton Lane is coming to an end, with "Riverbend" last in line in this cul-de-sac. They dug a trench to the "blind" corner by the bottom gate, and then bored below the road to surface at the top gate.

 

Looking towards Riverbend's bottom gate (marked with a blue sign)

 

The sewerage and the town water connections are now inside our gate.

 

Water connection inside our gate
Sewerage connection inside our gate

 

We've been told that we'll get their town water and they'll get our s**t before Christmas! I wonder who's getting the more desirable present?